Question: How long does it take to design and develop contracts and drawings for a kitchen remodeling project?
Answer: We have completed this process in as little as two weeks when the kitchen is going in the existing space. When the kitchen remodel includes moving walls or adding additional space it can take considerably longer. We ask clients to start thinking about what they want as early as possible so they don’t feel rushed or overwhelmed with the process. Owners must select the style of cabinets, materials for countertops, flooring styles, wall finishes, lighting, kitchen layout and other details that all must blend with each other. I believe a comfortable timetable for most people is two weeks to a month after you have decided on the kitchen layout. The best advice I can give is start early and take all the time you need to feel comfortable with your decisions.
Don Jason